This bathroom project video documents opened ceiling and floor areas, work around the tub, and wall fitting during renovation.


The footage shows a crew member working under an opened ceiling, an exposed floor area and fitting work near the tiled wall and tub. These are construction-stage views. The source material does not establish a finished result, so this page stays focused on the work in progress.

The video shows ceiling and floor areas opened so the visible construction work can continue.

Additional frames show work around the wall and tub area as the bathroom renovation progresses.